SL No Name of the Work Client/Owner Contract Amount Peroid of Execution
1 WIND POWER PROJECT:      
  Construction of WTG Foundations and WTG Substations (25 Nos.) -  Yelisirur wind farm Phase-II Beside Venkatapuram Village, near Gagad Town, Gadag Dist., Karnataka Bhoruka Powe Corporation Ltd  1557.15 Lakhs 2014-15
2 WIND POWER PROJECT:      
  Civil Foundations for 2MW WTG,  Roads, Platforms and Other Infra Works Besides Tuppaldoddi  Village, Near Kowtal Village, Raichur Dist., Karnataka Gamesa Wind Turbines Pvt Ltd 850 Lakhs 2014-15
3 NMDC - Bellari      
  Construction of Substation II for 723 DHC Conveyor for Downhill Conveyor System of Kumasraswamy Iron Ore Project of NMDC Ltd.,Package II at Donimalai, Bellary Dist., Karnataka, Through Elecon EPC Projects Ltd NMDC - Bellari Dist., Karnataka 195 Lakhs 2014-15
4 NTPC - VISAG:      
  Balance work of Lagoon 3&4 (Above 5.5 M and OFL) Ash Dyke Package for Simhadri State-II NTPC Ltd. Vizag 1698.99 Lakhs 2014-15
5 AP IRRIGATION PROJECTS:      
  Major Irrigation- Modernization of G.W.Delta system- Undi Canal and channel system from Km. 21.192 to Km 54.10 & Km 31.986 to Km 44.562 near Pippara AP Irrigation Department  1897 Lakhs 2013-14
6 AP IRRIGATION PROJECTS:      
  Modernisation of Kattelair Anicut Gangadevipadu for Irrigation, ear Kattleru Village, AP Irrigation Department  2085.75 Lakhs 2013-14
7 NTPC - VISAG:      
  Balance work of Lagoon 3&4 (Below 5.5 M and OFL) Ash Dyke Package for Simhadri State-II NTPC Ltd. Vizag 2469.99 Lakhs 2013-14
8 NTPC - KEHALGOAN:      
  Construction of 4th Raising of Ash Dyke Lagoon-2 at NTPC, Kehalgoan, Bihar NTPC Ltd.Kahalgaon 1361.73 Lakhs 2013-14
9 NTPC - VISAG:      
  Balance Civil works for Starter Dykes of Stage-2 (Below5.5RL) NTPC, Simhadri,Vizag NTPC Ltd. Vizag 2469.00 Lakhs 2013-14
10 NTPC - KEHALGOAN:      
  Construction of 2nd raising of Ash Dyke Lagoon-3C at Kahalgaon NTPC Ltd. Kahalgaon 911.98 Lakhs 2013-14
11 NTPC - FARAKKA      
  Construction of IInd Raising of Lagoon-1, Kendua Ash Dyke of NTPC, Farakka NTPC Ltd. Farakka 652.43 Lakhs 2013-14
12 NTPC - FARAKKA      
  1st Raising of Malancha Ash Dyke Lagoon-2 at NTPC ltd, Farakka NTPC Ltd. Farakka 946.96 Lakhs 2013-14
13 NTPC - KEHALGOAN:      
  Construction of 2nd Raising of Ash Dyke Lagoon-3 AB at KhSTPP,NTPC, Kahalgaon NTPC Ltd. Kahalgaon 1486.55 Lakhs 2013-14
14 NTPC - KEHALGOAN:      
  Construction of 2nd raising of Lagoon-1 at NTPC Simhadri, Vizag NTPC ,Simhadri, Vizag 2600.00 Lakhs 2013-14
15 NMDC - Bellari      
  Civil works of for 723 DHC Conveyor for Downhill Conveyor System of Kumasraswamy Iron Ore Project of NMDC Ltd.,Package II at Donimalai, Bellary Dist., Karnataka, Through Elecon EPC Projects Ltd NMDC - Bellari Dist., Karnataka 1266.86 Lakhs 2013-14
16 WIND POWER PROJECT:      
  Civil Works for WTC Foundation & Subsdtations at Rayabag windfarm, Belgaum Dist, Karnataka Bhoruka Powe Corporation Ltd 746.00 Lakhs 2013-14
17 AP IRRIGATION PROJECTS:      
  Earth work excation of Link Canal-2 from Dindi Balancing Reservoir to Tuneel-2 inlet from Km.0.000 to Km.1.450 in Nalgonda Dist.A.P AP Irrigation Department  956.40 Lakhs 2012-13
18 AP IRRIGATION PROJECTS:      
  Modernisation of Godavari Delta System - Bank Canal and Its Distributory System from 44.800 KM to 58.00 KM near Sidhantam Village, West Godavari District, Andhra Pradesh AP Irrigation Dept., Andhra Pradesh 1735 Lakhs 2012-13
19 WIND POWER PROJECT:      
  Formation of Roads, Platforms, Laying of 1.80 MW Turbine Foundations and other Infrastructure development works  besides Komatikuntla Village, near Tadipatri Town, Anantapur District, Andhra Pradesh  Leitner Sriram Manufacturing Ltd (LSML) and Vaata Infra Pvt Ltd 971 Lakhs 2012-13
20 WIND POWER PROJECT:      
  Project Approval Fecilitation for Harpanahalli  Wind Power Project, (Hara-II) Davangere District, Karnataka State  Vestas Wind Technology India Private Limited 330 Lakhs 2012-13
21 NTPC - KEHALGOAN:      
  Removal of Overburden works at Wagon Tippler Area at NTPC, Kahalgaon NTPC Ltd. Kahalgaon 74.19 Lakhs 2012-13
22 NTPC - KEHALGOAN:      
  Construction of 3rd Raising of Ash Dyke Lagoon II Work at  NTPC-KhSTPP, Kehalgoan, Bihar State NTPC Ltd., Kahalgoan 1416.84 Lakhs 2011-12
23 WIND POWER PROJECT:      
  Project Approval Fecilitation Agreement for Benekanahalli Wind Power Project, Davangere District, Karnataka State  Vestas Wind Technology India Private Limited 370 Lakhs 2011-12
24 NTPC - KEHALGOAN:      
  Construction of First Raising of Ash Dyke Lagoon at 3C Work at  NTPC, Kehalgoan, Bihar State, through NTPC Limited. NTPC Ltd., Kahalgoan, Bihar State 1050 Lakhs 2011-12
25 KARNATAKA HOUSING BOARD:      
  Proposed Development of Sites and Services work under Suryanagar Phase III near JigadaVillege, Anekal Taluq, Bangalore rural Dist., Karnataka Housing Board (KHB), Karnataka 4530 Lakhs 2011-12
26 KARNATAKA HOUSING BOARD:      
  Proposed Development of Sites and Services work under Suryanagar Phase II (Extention) near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist.,  Bangalore, Karnataka State Karnataka Housing Board (KHB), Karnataka 120 Lakhs 2011-12
27 WIND POWER PROJECT:      
  Formation of Roads, Platforms, Laying of Civil Foundations and other Infrastructure development works  near Shiragoan Village, Near Chikkodi Town, Chikkodi Taluq, Belgaum Dist.,  Karnataka State  Gamesa Wind Turbines Pvt Ltd 410 Lakhs 2011-12
28 KARNATAKA HOUSING BOARD:      
  Construction of Housing under "ASHERE SCHEME" near Ilkal Town, Ilkal Taluq, Bagalkot Dist., Karnataka State Karnataka Housing Board (KHB), Karnataka 675 Lakhs 2011-12
29 WIND POWER PROJECT:      
  Formation of Roads for Mobilization of Machineryfor your Wind Power Project at Bheemasamudra Village, Davangere Dist., Karnataka NSL Renewable Power Pvt Ltd 44 Lakhs 2010-11
30 HYDEL POWER PROJECT:      
  Construction of Roadway from Rispa Village to Moongual Village, Himachal Pradesh State NSL Tidong Powr Generation Pvt Ltd 450 Lakhs 2010-11
31 WIND POWER PROJECT:      
  Construction Roads for mobilization of Heavy Machinery at Phoolwadi village, Tamilnadu NSL Wind Power Company (Phoolwadi) Pvt Ltd 168 Lakhs 2010-11
32 NTPC - KEHALGOAN:      
  Construction of Ist Raising of Ash Dyke Lagoon at 3A and 3B Work at KHSTPP NTPC, Kehalgoan, Bihar State NTPC Ltd., Kahalgoan, Bihar State 1400 Lakhs 2010-11
33 WIND POWER PROJECT:      
  Laying of HT and LT Cable and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State  Acciona Energy India Pvt Ltd  - Elect Systems (ESEPL) 55 Lakhs 2010-11
34 WIND POWER PROJECT:      
  Formation of Roads and Platforms and other Infrastructure development works near Tuppadahalli Villege, Chennagiri Taluq, Davangere Dist, Karnataka State  Vestas Wind Technology India Private Limited 950 Lakhs 2010-11
35 KARNATAKA HOUSING BOARD:      
  Proposed Development of Sites and Services work under Suryanagar Phase II near Hinnakki Villege, Anekal Taluq, Bangalore rural Dist.,  Bangalore, Karnataka State Karnataka Housing Board (KHB), Karnataka 1850 Lakhs 2010-11
36 KARNATAKA HOUSING BOARD:      
  Construction of Housing under "ASHERE SCHEME" near Ganjyal Villege, Unugondu Taluq, Bagalkot Dist., Karnataka State Karnataka Housing Board (KHB), Karnataka 165 Lakhs 2010-11
37 WIND POWER PROJECT:      
  Formation of Roads and Platforms and other Infrastructure development works under Project Hara - I, near Arkanal Tanda Villege, Harapanahalli Taluq, Davangere Dist, Karnataka State  Vestas Wind Technology India Private Limited 765 Lakhs 2010-11
38 WIND POWER PROJECT:      
  Formation of Roads, Platforms and Laying of Foundations work near Chitradurga, Karnataka State  Chirnjeevi Wind Energy Ltd (CWEL) 50 Lakhs 2010-11
39 NPCC PROJECT:      
  Construction of IInd Raising of Ash Dyke Lagoon II Work for NPCC, Kehalgoan, Bihar State NPCC Limited - Kehalgoan 145 Lakhs 2009-10
40 WIND POWER PROJECT:      
  Constuction of Roads and other Infrastructure Work near Nagapatnam, Taminadu State NSL Renewable Power Pvt Ltd 280 Lakhs 2009-10
41 WIND POWER PROJECT:      
  Formation of Roads and Platforms and other Infrastructure development works near Bhimasamudra Village, Chitradurga Dist, Karnataka State Nuziveedu Seeds Limited (NSL)  1300 Lakhs 2009-10
42 ROAD WORKS:      
  Construction of Rural Roads undeer MP - PMJSY  at Bharwani Dist., Madhya Pradesh State. PMJSY - Madhya Pradesh 2950 Lakhs 2008-11
43 NTPC - KEHALGOAN:      
  Construction of Civil Works in Wagon tippler Complex for Coal Handling system throgh Elecon Engineering Company Ltd., NTPC - Kehalgoan 1800 Lakhs 2008-11
44 THERMAL POWR PROJECT AT ANDAL, WEST BENGAL:      
  Site Grading Work @ Coal handling Plant area for Durgapur Steel Thermal Power Corporation near Andal, Burdwan District, West Bengal State DVC/Thysen Krupp - Coastal Projects 1600 Lakhs 2008-10
45 WIND POWER PROJECT:      
  Formation of Roads, and Platforms and other Infrastructure development works near Telagi Village, Davangere Dist. Karnataka State  Vestas Wind Technology India Private Limited 580 Lakhs 2008-09
46 AP IRRIGATION PROJECTS:      
  Structural Fabrication Works for Velugonda Tunnel-II Package for Irrigation and CAD Dept at Domal, Prakasam Dist, Through HCC-CPL@ Domal Andhra Pradesh AP Irrigation Dept., 750 Lakhs 2007-08
47 AP IRRIGATION PROJECTS:      
  Structural Fabrication Works for Velugonda Tunnel-I Package  at Domala Prakasam Dist., through SEW, PRASAD, SABIR AND NSC CONSORTIUM., AP AP Irrigation Dept., 600 Lakhs 2007-08
48 AP IRRIGATION PROJECTS:      
  Pula Subbaiah Velugonda Tunnel - II Package for Irrigation and CAD Dept., , Prakasam Dist., Through HCC-CPL @ Dornala., AP AP Irrigation Dept., 1210 Lakhs 2007-08
49 WIND POWER PROJECT:      
  Development of Roads, Platforms and other Infrastructure Development works - under project "VAAYU" near Bharmasagara village, Davam gere District and near Anaburu village, Jagalore Taluq, Devanagere Dist., Vestas Wind Technology India Private Limited 400 Lakhs 2007-08
50 WIND POWER PROJECT:      
  Construction of Platforms (Phase-II) Hirakandavadi Village, Chitradurga Dist., Karnataka State Nuziveedu Seeds Limited (NSL)  60 Lakhs 2007-08
51 INFRA WORKS:      
  Divyasree NSL Infrastructure @ Tech Place, Rayadurgam -Site Development Works etc., - Hyderabad. Nuziveedu Seeds Limited (NSL)  4800 Lakhs 2006-09
52 AP IRRIGATION PROJECTS:      
  Open Excavation work for construction of Ramp to reach Portal Point at outlet of Srisailam Left Bank Tunnel scheme of ALIMINETI MADHAVA REDDY PROJECT (AMRP) , at Devarakonda, Nalgonda Dist., A.P  Coastal Projects Pvt. Ltd., 255 Lakhs 2006-07
53 AP IRRIGATION PROJECTS:      
  Pula Subbaiah Velugonda Tunnel - I Project - Package  near Domala, Prakasam Dist., Through SEW, PRASAD, SABIR and NSC CONSORTIUM., AP AP Irrigation Dept., 1230 Lakhs 2006-07
54 WIND POWER PROJECT:      
  Formation of Roads and Platforms and other Infrastructure development works near Chikkodi, Belgaum Dist., Kamataka State and Phase II near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State  Vestas Wind Technology India Private Limited 70 Lakhs 2006-07
55 AP IRRIGATION PROJECTS:      
  Execution of High Level Left Main Canal Distribution System under package - 14 of BIMA LIFT IRRIGATION PROJECT, including construction of CMCD WORKS UNDER EPC to feed an ayacut of 35,800 acres, Under Sangambanda Balancing Reservoir -Survey & Execution of work. AP Irrigation Dept., 2500 Lakhs 2005-08
56 WIND POWER PROJECT:      
  Formation of Roads and Platforms and other infrastructure development work near Arisanagundi Village, Jagalore Taluq, Davangere Dist., Karnataka State   Neg-Micon India Pvt., Ltd.,  216 Lakhs 2005-06
57 IRRIGATION WORKS:      
  SRBC - Canal Excavation and Laying of concrete lining for AP Irrigation Department AP Irrigation Dept.,  600 Lakhs 2004-05
58 ROAD WORKS:      
  Construction / Up gradation of Roads under PMGSY Package No. M.P03-04 and 22-04, Khargone, Madhya Pradesh. PMJSY - Madhya Pradesh 708 Lakhs 2004-05